Dlf Techpark Noida Phase 2 is registered with UP-RERA under registration number UPRERAPRJ385951/08/2024, registered on 16 Aug 2024 by Urvasi Infratech Private Limited. The completion date on file is 30 Sep 2026. This page mirrors the project's public UP-RERA record, with 23 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Dlf Techpark Noida Phase 2
- RERA registration no.
- UPRERAPRJ385951/08/2024
- Registration type
- New
- Registration date
- 16 Aug 2024
- Proposed start
- 01 Apr 2023
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Plot No. 1, Sector 143A, Noida, Gautam Buddha Nagar, U.P
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Urvasi Infratech Private Limited
- Type
- Company
- Registered office
- 12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
- Projects on the register
- 2
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ385951/08/2024, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
23 documents filed on the UP-RERA portal for UPRERAPRJ385951/08/2024. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
99% of the registered build period has passed; 36% of the estimated cost is certified spent. The spend figure comes from the CA certificate linked above, the clock from the registered start and completion dates on the register.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- BhaubhayLicence None
- Structural engineer
- RAKESH CHAUHANM/s TPC Technical Projects Consultants Pvt. Ltd.
More from Urvasi Infratech...
Other projects nearby
Frequently asked
Is Dlf Techpark Noida Phase 2 RERA registered?
Yes. Dlf Techpark Noida Phase 2 is registered with UP-RERA under registration number UPRERAPRJ385951/08/2024, registered on 16 Aug 2024.
When is Dlf Techpark Noida Phase 2 due for completion?
The completion date on record for Dlf Techpark Noida Phase 2 is 30 Sep 2026. Read it yourself against registration UPRERAPRJ385951/08/2024 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Dlf Techpark Noida Phase 2?
Urvasi Infratech Private Limited, which has 2 projects registered with UP-RERA.
Where can I verify Dlf Techpark Noida Phase 2's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ385951/08/2024. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Dlf Techpark Noida Phase 2. Straight answers, before you sign anything.