Irish Platinum is registered with UP-RERA under registration number UPRERAPRJ503189/03/2024, registered on 02 Mar 2024 by Irish Buildcon Private Limited. The completion date on file is 31 Jan 2029. This page mirrors the project's public UP-RERA record, with 18 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Irish Platinum
- RERA registration no.
- UPRERAPRJ503189/03/2024
- Registration type
- New
- Registration date
- 02 Mar 2024
- Proposed start
- 01 Jan 2024
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Gh-04A Sector-10 Greater Noida
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Irish Buildcon Private Limited
- Type
- Company
- Registered office
- Gh-04A Sector 10 Greater Noida
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ503189/03/2024, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
18 documents filed on the UP-RERA portal for UPRERAPRJ503189/03/2024. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
53% of the registered build period has passed; 22% of the estimated cost is certified spent. The spend figure comes from the CA certificate linked above, the clock from the registered start and completion dates on the register.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Boundary wall
- Proposed as per survey drawing and architectural drawing.
- Roads
- RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
- Footpaths
- Constructed as per architectural site plan and landscape drawing.
- Water supply / tanks
- From Authority, collected in Underground Water reservoirs & Terrace Tanks, with Hydro Pneumatic pumps.
- Sewer System
- RCC hume pipe with Manhole, Chambers, Collection chamber, and connections with Authority Sewer System.
- Rainwater harvesting
- Drains collect water to 4 rainwater harvesting chambers. Runoff load 570.49 m3/hr, requiring 5.94 recharge pits (8x6x2m each).
- Parks
- Open/green area at podium level (40% of plot area, 4015 sq.m), 94 trees.
- Electric supply / transformers
- Developed as per architect/consultant design. Power requirement 1329.02 KW. 2 transformers (total 1575 KVA). NPCL source. 2x160 KVA silent DG sets for backup.
- Sewage treatment (STP) capacity
- 240 KLD STP for wastewater. 169 KLD treated water for DG cooling, horticulture & flushing.
- Solid Waste Management
- Segregation at source (60% bio-degradable, 30% non bio-degradable, 10% inert). Dedicated storage site. STP sludge, horticultural waste, and organic waste converted to manure.
- Fire safety & staircases
- Fire NOC obtained. Facilities: Hose reel, Landing valve, Wet riser/F.A inlet, extinguishers (IS-2190), automatic sprinkler system, fire detection/alarm, yard hydrants, PA system, firemen switch in one lift, mechanical ventilation in basement. Fire staircase in each of four towers as per NBC. 9/7.5m wide fire tender path.
- Community Buildings
- 1st floor (585.510 sqm) and 2nd floor (307.024 sqm), total 892.534 sqm.
- Social Infrastructure
- Stilt (297 sqm) and 1st floor (543 sqm) space, total 840 sqm.
- Entry/Exit
- Dedicated separate entry/exit for visitors/residents for security and vehicular movement.
Other projects nearby
Frequently asked
Is Irish Platinum RERA registered?
Yes. Irish Platinum is registered with UP-RERA under registration number UPRERAPRJ503189/03/2024, registered on 02 Mar 2024.
When is Irish Platinum due for completion?
The completion date on record for Irish Platinum is 31 Jan 2029. Read it yourself against registration UPRERAPRJ503189/03/2024 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Irish Platinum?
Irish Buildcon Private Limited, which has 1 project registered with UP-RERA.
Where can I verify Irish Platinum's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ503189/03/2024. This page mirrors that public record for convenience.