New No extensions UPRERAPRJ503189/03/2024

Irish Platinum

by Irish Buildcon Private Limited · Dadri

Completion on record
31 Jan 2029
Declared at registration · no extensions filed
Speak with an advisor
Irish Platinum, project image
Builder marketing render via searchurhome.com, a promotional image, not a UP-RERA record.
Overview Land & costProgressEscrowDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ503189/03/2024
Gautam Buddha Nagar
Registered
02 Mar 2024
Type: New
Proposed period
61 mo
from 01 Jan 2024
Declared completion
31 Jan 2029
original commitment
Latest on record
31 Jan 2029
unchanged
Documents on portal
18
filed with UP-RERA
01

Registration details

Project name
Irish Platinum
RERA registration no.
UPRERAPRJ503189/03/2024
Registration type
New
Registration date
02 Mar 2024
Proposed start
01 Jan 2024
District / tehsil
Gautam Buddha NagarDadri
Project address
Gh-04A Sector-10 Greater Noida
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Irish Buildcon Private Limited
Type
Company
Registered office
Gh-04A Sector 10 Greater Noida
Projects on the register
1
Complaints · promoter-wide
00 (Under Registration - 0 )
Complaints · this project
0filed against Irish Platinum

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Land area
4.65 ac
18,819 m²
Project size
4.0 bldgs
Project cost
₹578 Cr
construction ₹435 Cr
Cost incurred
₹124 Cr
21.5% of estimated cost
From allottees
₹0 Cr
collected to date
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Certified spend22%
of the estimated project cost, certified spent to date
Build clock51%
of the registered build period elapsed

The build clock is running ahead of certified spend: 51% of the registered timeline has passed, but only 22% of the budget is certified spent. A gap worth asking the promoter about.

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Bank account

The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →

Collection account
A/c no. 414605001685
Branch GREATER NOIDA WEST
07

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Boundary wall
Proposed as per survey drawing and architectural drawing.
Roads
RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
Footpaths
Constructed as per architectural site plan and landscape drawing.
Water supply / tanks
From Authority, collected in Underground Water reservoirs & Terrace Tanks, with Hydro Pneumatic pumps.
Sewer System
RCC hume pipe with Manhole, Chambers, Collection chamber, and connections with Authority Sewer System.
Rainwater harvesting
Drains collect water to 4 rainwater harvesting chambers. Runoff load 570.49 m3/hr, requiring 5.94 recharge pits (8x6x2m each).
Parks
Open/green area at podium level (40% of plot area, 4015 sq.m), 94 trees.
Electric supply / transformers
Developed as per architect/consultant design. Power requirement 1329.02 KW. 2 transformers (total 1575 KVA). NPCL source. 2x160 KVA silent DG sets for backup.
Sewage treatment (STP) capacity
240 KLD STP for wastewater. 169 KLD treated water for DG cooling, horticulture & flushing.
Solid Waste Management
Segregation at source (60% bio-degradable, 30% non bio-degradable, 10% inert). Dedicated storage site. STP sludge, horticultural waste, and organic waste converted to manure.
Fire safety & staircases
Fire NOC obtained. Facilities: Hose reel, Landing valve, Wet riser/F.A inlet, extinguishers (IS-2190), automatic sprinkler system, fire detection/alarm, yard hydrants, PA system, firemen switch in one lift, mechanical ventilation in basement. Fire staircase in each of four towers as per NBC. 9/7.5m wide fire tender path.
Community Buildings
1st floor (585.510 sqm) and 2nd floor (307.024 sqm), total 892.534 sqm.
Social Infrastructure
Stilt (297 sqm) and 1st floor (543 sqm) space, total 840 sqm.
Entry/Exit
Dedicated separate entry/exit for visitors/residents for security and vehicular movement.
09

Frequently asked

Is Irish Platinum RERA registered?

Yes. Irish Platinum is registered with UP-RERA under registration number UPRERAPRJ503189/03/2024, registered on 02 Mar 2024.

What is the RERA completion date for Irish Platinum?

The completion date on record is 31 Jan 2029, with no extensions filed against the original commitment.

Who is the developer of Irish Platinum?

Irish Buildcon Private Limited, which has 1 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.

How many complaints are filed against Irish Platinum?

0 complaint(s) are recorded against Irish Platinum specifically on the UP-RERA portal.

Where can I verify Irish Platinum's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ503189/03/2024. This page mirrors that public record for convenience.