New No extensions UPRERAPRJ720547

Dlf Techpark Noida

by Urvasi Infratech Private Limited · Dadri

Completion on record
01 Apr 2024
Declared at registration · no extensions filed
Speak with an advisor
Dlf Techpark Noida, project image
Water Supply Plan filed with UP-RERA for this project, view on the portal ↗
Overview Land & costTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ720547
Gautam Buddha Nagar
Registered
01 Oct 2022
Type: New
Proposed period
39 mo
from 06 Jan 2021
Declared completion
01 Apr 2024
original commitment
Latest on record
01 Apr 2024
unchanged
Documents on portal
19
filed with UP-RERA
01

Registration details

Project name
Dlf Techpark Noida
RERA registration no.
UPRERAPRJ720547
Registration type
New
Registration date
01 Oct 2022
Proposed start
06 Jan 2021
District / tehsil
Gautam Buddha NagarDadri
Project address
Not stated on the register
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Urvasi Infratech Private Limited
Type
Company
Registered office
12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
Projects on the register
2
Complaints · promoter-wide
00 (Under Registration - 0 )
Complaints · this project
0filed against Dlf Techpark Noida

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Project size
2.0 bldgs
Floors
7.0
05

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
UJJAL KARLicence CA/2017/82316
06

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Sewage treatment (STP) capacity
MBBR STP provided for Data Centre and IT Block. Overflow connected to municipal sewerage system.
Electric supply / transformers
Centralized Transformer, HT/LT panels, Feeder Pillar, DG back for common services. Electrical system as per NBC Code/Local Electricity Board.
Fire safety & staircases
Fire Fighting and Protection system as per NBC Code. Fire staircase and refuse area for emergency evacuation.
Water supply / tanks
Treated water supply for Block A & B via WTP Plant Room.
Rainwater harvesting
Rainwater harvesting pit for ground water recharge, connected to storm water drainage. Overflow to municipal drain.
Boundary wall
2400mm high boundary wall for Block A (600mm toe wall, 1800mm railing) and Block B (barbed wire above).
Roads
Minimum 6M wide driveways: concrete pavers for Block A, tremix for Block B.
Parks
Green areas, lawns, and multipurpose lawn planned along plot lines and buildings for Block A & B.
09

Frequently asked

Is Dlf Techpark Noida RERA registered?

Yes. Dlf Techpark Noida is registered with UP-RERA under registration number UPRERAPRJ720547, registered on 01 Oct 2022.

What is the RERA completion date for Dlf Techpark Noida?

The completion date on record is 01 Apr 2024, with no extensions filed against the original commitment.

Who is the developer of Dlf Techpark Noida?

Urvasi Infratech Private Limited, which has 2 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.

How many complaints are filed against Dlf Techpark Noida?

0 complaint(s) are recorded against Dlf Techpark Noida specifically on the UP-RERA portal.

Where can I verify Dlf Techpark Noida's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ720547. This page mirrors that public record for convenience.

Want to go through this file before you commit?

Speak with an advisor who has actually read this file, the complaints, the paperwork behind Dlf Techpark Noida. Straight answers, before you sign anything.

Speak with an advisor

Private line · no obligation