Dasnac Westminster is registered with UP-RERA under registration number UPRERAPRJ239402/06/2024, registered on 20 Jun 2024 by E Homes Infrastructure Pvt Ltd. The completion date on file is 22 Apr 2029. This page mirrors the project's public UP-RERA record, with 23 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Dasnac Westminster
- RERA registration no.
- UPRERAPRJ239402/06/2024
- Registration type
- New
- Registration date
- 20 Jun 2024
- Proposed start
- 23 Apr 2024
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- GH-02/C, SECTOR 146
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- E Homes Infrastructure Pvt Ltd
- Type
- Company
- Registered office
- DASNAC ANNEXE I ECE HOUSE 28A KASTURBA GANDHI MARG NEW DELHI 110001
- Projects on the register
- 5
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ239402/06/2024, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
23 documents filed on the UP-RERA portal for UPRERAPRJ239402/06/2024. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- Mohammed AzharLicence CA/2015/72131
- Structural engineer
- Amit ChaudharyCreative Consultants & Engineers
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage Treatment Plant (STP)
- Provision for STP with collection, aeration, clear water, and sludge holding tanks.
- Electric Supply
- Not specified in this plan.
- Fire Safety System
- Fire lines, yard hydrants (33mm dia), 2-way & 4-way fire brigade connections, various valves.
- Staircases
- Not detailed in this plan.
- Water Supply
- Municipal supply, rising main, recycled water for horticulture, proposed tube well, garden hydrants.
- Water Tanks
- Underground tank & pump room, terrace water tank.
- Rainwater Harvesting
- Provision for rainwater harvesting system.
- Boundary Wall
- 200 mm thick boundary wall.
- Roads & Paving
- Access from 45m and 9m wide roads, internal hard paved areas, scooter/car parking, commercial parking.
- Water Bodies
- Designated water body within green area.
- Parks / Green Areas
- Extensive green areas with hard paved sections, pathways, and horticulture.
More from E Homes Infrastructure Pvt Ltd
Other projects nearby
Frequently asked
Is Dasnac Westminster RERA registered?
Yes. Dasnac Westminster is registered with UP-RERA under registration number UPRERAPRJ239402/06/2024, registered on 20 Jun 2024.
When is Dasnac Westminster due for completion?
The completion date on record for Dasnac Westminster is 22 Apr 2029. Read it yourself against registration UPRERAPRJ239402/06/2024 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Dasnac Westminster?
E Homes Infrastructure Pvt Ltd, which has 5 projects registered with UP-RERA.
Where can I verify Dasnac Westminster's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ239402/06/2024. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Dasnac Westminster. Straight answers, before you sign anything.