Crc Maesta is registered with UP-RERA under registration number UPRERAPRJ724518/07/2024, registered on 12 Jul 2024 by Crc Homes Private Limited. The completion date on file is 21 May 2029. This page mirrors the project's public UP-RERA record, with 20 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Crc Maesta
- RERA registration no.
- UPRERAPRJ724518/07/2024
- Registration type
- New
- Registration date
- 12 Jul 2024
- Proposed start
- 01 Jun 2024
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- PLOT NO.11B
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Crc Homes Private Limited
- Type
- Company
- Registered office
- Registered Office Address- SHOP NO. 111, VARDHMAN MAYUR MARKET KONDLI MAYUR VIHAR PHASE-III, DELHI 110096 Corporate Office Address- GROUND FLOOR, LOGIX TECHNO PARK SECTOR-127 NOIDA. 201301 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST. 201306
- Projects on the register
- 2
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ724518/07/2024, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
20 documents filed on the UP-RERA portal for UPRERAPRJ724518/07/2024. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- VIKAS KUMAR GOELLicence CA/94/17889
- Structural engineer
- Dr. Maqsud E NazarNNC DESIGN INTERNATIONAL
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment
- STP capacity: 250 KLD
- Electric supply / transformers
- 1x 500 KVA CSS (EV charging), 1x 800 KVA CSS (common services), 2x 1250 KVA CSS (residential)
- Fire safety & staircases
- Yard hydrant system with 63mm dia. single headed hydrant valves, 9m wide fire tender access roads
- Water supply / tanks
- Underground tank: 200 KL domestic, 540 KL fire, total 740 KL
- Rainwater harvesting
- 3 sets of desilting tanks (2.5x1.75x2m) and recharge pits (3.5x1.75x2m)
- Boundary wall
- Provided along project perimeter
- Roads
- 24m wide main road, 12m wide side road, 7.5m wide internal driveway, 9m wide fire tender roads, 5.5m wide basement ramp
- Water bodies
- Swimming pool
- Parks
- Landscaped green areas with garden hydrants
More from Crc Homes Private Limited
Other projects nearby
Frequently asked
Is Crc Maesta RERA registered?
Yes. Crc Maesta is registered with UP-RERA under registration number UPRERAPRJ724518/07/2024, registered on 12 Jul 2024.
When is Crc Maesta due for completion?
The completion date on record for Crc Maesta is 21 May 2029. Read it yourself against registration UPRERAPRJ724518/07/2024 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Crc Maesta?
Crc Homes Private Limited, which has 2 projects registered with UP-RERA.
Where can I verify Crc Maesta's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ724518/07/2024. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Crc Maesta. Straight answers, before you sign anything.