Registration details
- Project name
- Crc Maesta
- RERA registration no.
- UPRERAPRJ724518/07/2024
- Registration type
- New
- Registration date
- 12 Jul 2024
- Proposed start
- 01 Jun 2024
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- PLOT NO.11B
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Crc Homes Private Limited
- Type
- Company
- Registered office
- Registered Office Address- SHOP NO. 111, VARDHMAN MAYUR MARKET KONDLI MAYUR VIHAR PHASE-III, DELHI 110096 Corporate Office Address- GROUND FLOOR, LOGIX TECHNO PARK SECTOR-127 NOIDA. 201301 Site Address- GH-8A TECHZONE-IV GREATER NOIDA WEST. 201306
- Projects on the register
- 2
- Complaints · promoter-wide
- 00 (Under Registration - 0 )
- Complaints · this project
- 0filed against Crc Maesta
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
20 documents filed on the UP-RERA portal for UPRERAPRJ724518/07/2024. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- VIKAS KUMAR GOELLicence CA/94/17889
- Structural engineer
- Dr. Maqsud E NazarNNC DESIGN INTERNATIONAL
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment
- STP capacity: 250 KLD
- Electric supply / transformers
- 1x 500 KVA CSS (EV charging), 1x 800 KVA CSS (common services), 2x 1250 KVA CSS (residential)
- Fire safety & staircases
- Yard hydrant system with 63mm dia. single headed hydrant valves, 9m wide fire tender access roads
- Water supply / tanks
- Underground tank: 200 KL domestic, 540 KL fire, total 740 KL
- Rainwater harvesting
- 3 sets of desilting tanks (2.5x1.75x2m) and recharge pits (3.5x1.75x2m)
- Boundary wall
- Provided along project perimeter
- Roads
- 24m wide main road, 12m wide side road, 7.5m wide internal driveway, 9m wide fire tender roads, 5.5m wide basement ramp
- Water bodies
- Swimming pool
- Parks
- Landscaped green areas with garden hydrants
More from Crc Homes Private Limited
Other projects nearby
Frequently asked
Is Crc Maesta RERA registered?
Yes. Crc Maesta is registered with UP-RERA under registration number UPRERAPRJ724518/07/2024, registered on 12 Jul 2024.
What is the RERA completion date for Crc Maesta?
The completion date on record is 21 May 2029, with no extensions filed against the original commitment.
Who is the developer of Crc Maesta?
Crc Homes Private Limited, which has 2 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.
How many complaints are filed against Crc Maesta?
0 complaint(s) are recorded against Crc Maesta specifically on the UP-RERA portal.
Where can I verify Crc Maesta's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ724518/07/2024. This page mirrors that public record for convenience.