Sobha Aurum is registered with UP-RERA under registration number UPRERAPRJ361748/06/2025, registered on 17 Jun 2025 by Sobha Limited. The completion date on file is 30 Apr 2030. This page mirrors the project's public UP-RERA record, with 23 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Sobha Aurum
- RERA registration no.
- UPRERAPRJ361748/06/2025
- Registration type
- New
- Registration date
- 17 Jun 2025
- Proposed start
- 01 Jul 2025
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- B-255, Sector 36, Greater Noida, U.P.
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Sobha Limited
- Type
- Company
- Registered office
- Sobha Limited, Sarjapur-Marthahalli Outer Ring Road, Bellandur Post, Bangalore - 560103
- Projects on the register
- 2
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ361748/06/2025, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
23 documents filed on the UP-RERA portal for UPRERAPRJ361748/06/2025. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Site coordinates read from the same filings: 28.4605, 77.5410833 — view on map ↗. A coordinate is not a UP-RERA register field; the register records the district, tehsil and address shown above.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- VENKATESH GUDILicence CA/2005/36913
- Structural engineer
- OUSEPPACHAN C. AMBOOKENM/s. SOBHA LIMITED
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage Treatment Plant
- Located at Basement 2nd & 3rd
- Electrical Rooms
- Located at Ground Level
- Transformer Yard
- Located at Ground Level
- DG Room
- Located at Basement 2 Level
- Fire Safety System
- Includes Single Yard Hydrant with Hose Box, 4-Way FBC, 2-Way FBC
- Underground Water Tank
- Located at Basement -01, 02 & 03
- Water Supply Source
- Municipal/Tanker Water/Borewell water to UG Tank
- Rainwater Harvesting Tank
- Capacity: 200 KL, located at Ground Floor
- Boundary Wall
- Provided along the site perimeter
- Roads
- Internal driveways, including 24m wide main driveway
- Parks & Green Areas
- Includes Exhibition Lawn, Amphitheatre, Tennis Court, Cricket Pitch, Canopy Grove
More from Sobha Limited
Other projects nearby
Frequently asked
Is Sobha Aurum RERA registered?
Yes. Sobha Aurum is registered with UP-RERA under registration number UPRERAPRJ361748/06/2025, registered on 17 Jun 2025.
When is Sobha Aurum due for completion?
The completion date on record for Sobha Aurum is 30 Apr 2030. Read it yourself against registration UPRERAPRJ361748/06/2025 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Sobha Aurum?
Sobha Limited, which has 2 projects registered with UP-RERA.
Where can I verify Sobha Aurum's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ361748/06/2025. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Sobha Aurum. Straight answers, before you sign anything.