Delta Square is registered with UP-RERA under registration number UPRERAPRJ787189/12/2025, registered on 22 Dec 2025 by Baba Projects Private Limited. The completion date on file is 15 Oct 2030. This page mirrors the project's public UP-RERA record, with 18 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Delta Square
- RERA registration no.
- UPRERAPRJ787189/12/2025
- Registration type
- New
- Registration date
- 22 Dec 2025
- Proposed start
- 01 Nov 2025
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- Plot No. SLC-08/G/6, Sector-Delta -2, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201308
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Baba Projects Private Limited
- Type
- Company
- Registered office
- Regd Office - House No. -2K/74, Bariatuhousing Colony, P.O.-Bariatu, P.S.-Bariatu,Ranchi, Jharkhand,PIN-834009 Corporate Offce - C-63, Block-C, Sector 58, NOIDA,Gautam Buddha Nagar,Uttar Pradesh,PIN-201301
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ787189/12/2025, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
18 documents filed on the UP-RERA portal for UPRERAPRJ787189/12/2025. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Site coordinates read from the same filings: 28.48626, 77.5185889 — view on map ↗. A coordinate is not a UP-RERA register field; the register records the district, tehsil and address shown above.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- RAVI RAJ JAINLicence CA/2024/170151
- Structural engineer
- Atul SaxenaNone
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Electric supply / transformers
- Meter Room (3x3m = 9 sq.mt)
- Fire safety & staircases
- Fire Tower Mumty; Refuge Area provided: 45.19 sq.mt (8th floor), 47.84 sq.mt (12A floor)
- Water supply / tanks
- Overhead Tank (LVL +58800, 3.2x6m); Water Tank above Mumty Roof (LVL +62100); Total O.H. Tank area 45.089 sq.mt
- Rainwater harvesting
- Recharge pit (bore 250mm dia, 150mm slotted pipe)
- Boundary wall
- Constructed with stone plaster, brickwork, PCC, boulder soling; Height approx 1.95m
- Roads
- 4.5 MT Wide Road (side), 60 MT Wide Road (front), 9 MT W Service Road
- Parks
- Green Area proposed 348.27 sq.mt (25.04%); 14 trees provided (7 evergreen, 7 seasonal)
Other projects nearby
Frequently asked
Is Delta Square RERA registered?
Yes. Delta Square is registered with UP-RERA under registration number UPRERAPRJ787189/12/2025, registered on 22 Dec 2025.
When is Delta Square due for completion?
The completion date on record for Delta Square is 15 Oct 2030. Read it yourself against registration UPRERAPRJ787189/12/2025 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Delta Square?
Baba Projects Private Limited, which has 1 project registered with UP-RERA.
Where can I verify Delta Square's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ787189/12/2025. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Delta Square. Straight answers, before you sign anything.