Registration details
- Project name
- Nirala Gateway
- RERA registration no.
- UPRERAPRJ531916/06/2025
- Registration type
- New
- Registration date
- 17 Jun 2025
- Proposed start
- 01 May 2025
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- Plot No. C-7
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Parth Builtech Private Limited
- Type
- Company
- Registered office
- G-83/207, Vijay Chowk, Laxmi Nagar, Delhi-110092 and Corporate office Address as Office No.21, Logix Infotech Park, Ground Floor, D-5, Sector-59, Noida-201301, Uttar Pradesh.
- Projects on the register
- 2
- Complaints · promoter-wide
- 22 (Under Registration - 1 )
- Complaints · this project
- 1filed against Nirala Gateway
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
28 documents filed on the UP-RERA portal for UPRERAPRJ531916/06/2025. Each opens on the official portal record.
Land, build & cost
Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Location
Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →
- Coordinates
- 28.565344722, 77.477915
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- Rajiv GandhiLicence CA/91/13852
- Structural engineer
- SANJEEV AGRAWALCSV Techno Services (P) Ltd.
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment (STP) capacity
- Dedicated Sewage Treatment Plant (STP) installed
- Electric supply / transformers
- Electrical substation with transformers, HT/LT panels, DG sets, grid & backup power, street lights
- Fire safety & staircases
- Internal & external fire hydrant, sprinklers, fire detection & alarm system, fire staircase
- Water supply / tanks
- Water supply from Greater Noida Industrial Development Authority, Water Treatment Plant (WTP) installed
- Rainwater harvesting
- Rainwater harvesting chambers installed
- Boundary wall
- 1.5m & 2.0m high brick boundary wall with permanent furnishing
- Roads
- 7.5m wide internal cement concrete roads with pavers
- Parks
- Landscaped parks with trees, shrubs, ground covers, recreational areas, benches, walkways
More from Parth Builtech Private Limited
Other projects nearby
Frequently asked
Is Nirala Gateway RERA registered?
Yes. Nirala Gateway is registered with UP-RERA under registration number UPRERAPRJ531916/06/2025, registered on 17 Jun 2025.
What is the RERA completion date for Nirala Gateway?
The completion date on record is 29 Apr 2030, with no extensions filed against the original commitment.
Who is the developer of Nirala Gateway?
Parth Builtech Private Limited, which has 2 project(s) registered with UP-RERA and 2 complaint(s) on record across its projects.
How many complaints are filed against Nirala Gateway?
1 complaint(s) are recorded against Nirala Gateway specifically on the UP-RERA portal.
Where can I verify Nirala Gateway's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ531916/06/2025. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the complaints, the paperwork behind Nirala Gateway. Straight answers, before you sign anything.
Private line · no obligation