Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up is registered with UP-RERA under registration number UPRERAPRJ928123/05/2025, registered on 10 May 2025 by Superemo Infratech Private Limited. The completion date on file is 05 Mar 2030. This page mirrors the project's public UP-RERA record, with 43 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up
- RERA registration no.
- UPRERAPRJ928123/05/2025
- Registration type
- New
- Registration date
- 10 May 2025
- Proposed start
- 02 Apr 2025
- District / tehsil
- Gautam Buddha NagarGautam Buddha Nagar
- Project address
- PLOT NO. C-2, BLOCK - C, ALPHA - 2, GAUTAM BUDDHA NAGAR, UTTAR PRADESH
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Superemo Infratech Private Limited
- Type
- Company
- Registered office
- 201 NIRMAL TOWERS BARAKHAMBA ROAD, DELHI - 110001
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ928123/05/2025, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
43 documents filed on the UP-RERA portal for UPRERAPRJ928123/05/2025. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- KULMEET SHANGARILicence CA/97/21741
- Structural engineer
- Yatendra PaliwalGlobal Design Engineers Pvt Ltd
Other projects nearby
Frequently asked
Is Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up RERA registered?
Yes. Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up is registered with UP-RERA under registration number UPRERAPRJ928123/05/2025, registered on 10 May 2025.
When is Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up due for completion?
The completion date on record for Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up is 05 Mar 2030. Read it yourself against registration UPRERAPRJ928123/05/2025 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up?
Superemo Infratech Private Limited, which has 1 project registered with UP-RERA.
Where can I verify Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ928123/05/2025. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Migsun Alpha Central Pno C2 Cb Alpha Ii Gn, Up. Straight answers, before you sign anything.