New No extensions UPRERAPRJ639770/06/2025

Jade County Phase-2

by Themecounty Private Limited · Dadri

Completion on record
30 Sep 2031
Declared at registration · no extensions filed
Speak with an advisor
Jade County Phase-2, project image
Development Work Plan filed with UP-RERA for this project, view on the portal ↗
Overview Land & costProgressEscrowTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ639770/06/2025
Gautam Buddha Nagar
Registered
03 Jun 2025
Type: New
Proposed period
77 mo
from 01 May 2025
Declared completion
30 Sep 2031
original commitment
Latest on record
30 Sep 2031
unchanged
Documents on portal
20
filed with UP-RERA
01

Registration details

Project name
Jade County Phase-2
RERA registration no.
UPRERAPRJ639770/06/2025
Registration type
New
Registration date
03 Jun 2025
Proposed start
01 May 2025
District / tehsil
Gautam Buddha NagarDadri
Project address
Plot No. GH-10 , Cherrywood Enclave, Sector-8, Wave City, near NH-24 Ghaziabad, Tehsil Dadri, District-Gautam Buddha Nagar, Uttar Pradesh.
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
Themecounty Private Limited
Type
Company
Registered office
8th Floor, Plot No. 15, Sector 135, Nagla Charandas, Gautam Buddha Nagar, Dadri, Uttar Pradesh, India, 201305
Projects on the register
5
Complaints · promoter-wide
00 (Under Registration - 0 )
Complaints · this project
0filed against Jade County Phase-2

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Land area
4.76 ac
19,269 m²
Project size
4.0 bldgs
Floors
30.0
Project cost
₹641 Cr
construction ₹504 Cr
Cost incurred
₹69 Cr
10.8% of estimated cost
From allottees
₹0 Cr
collected to date
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Certified spend11%
of the estimated project cost, certified spent to date
Build clock20%
of the registered build period elapsed
Physical build0%
of construction complete, per the engineer's certificate

Certified spend is broadly keeping pace with the build timeline.

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Bank account

The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →

Collection account
A/c no. 5949965113
07

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
RAVI RAJ JAINLicence CA/2024/170151
Structural engineer
Atul SaxenaNone
08

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Boundary wall
Provided along plot perimeter
Roads (external)
Abutting 56m, 46m, 62m wide roads
Roads (internal)
9.0m wide fire tender path
Fire safety
9.0m wide fire tender path
Electric supply
Electrical Sub-Stations (ESS) provided
Parks / Green spaces
Landscape area, 53939.49 Sqm green & open space
11

Frequently asked

Is Jade County Phase-2 RERA registered?

Yes. Jade County Phase-2 is registered with UP-RERA under registration number UPRERAPRJ639770/06/2025, registered on 03 Jun 2025.

What is the RERA completion date for Jade County Phase-2?

The completion date on record is 30 Sep 2031, with no extensions filed against the original commitment.

Who is the developer of Jade County Phase-2?

Themecounty Private Limited, which has 5 project(s) registered with UP-RERA and 0 complaint(s) on record across its projects.

How many complaints are filed against Jade County Phase-2?

0 complaint(s) are recorded against Jade County Phase-2 specifically on the UP-RERA portal.

Where can I verify Jade County Phase-2's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ639770/06/2025. This page mirrors that public record for convenience.

Want to go through this file before you commit?

Speak with an advisor who has actually read this file, the complaints, the paperwork behind Jade County Phase-2. Straight answers, before you sign anything.

Speak with an advisor

Private line · no obligation