Trecento Residences-A is registered with UP-RERA under registration number UPRERAPRJ283531, registered on 09 Oct 2023 by Golf Lake Llp. The completion date on file is 17 Jul 2028. This page mirrors the project's public UP-RERA record, with 26 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Trecento Residences-A
- RERA registration no.
- UPRERAPRJ283531
- Registration type
- New
- Registration date
- 09 Oct 2023
- Proposed start
- 01 Oct 2023
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Not stated on the register
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Golf Lake Llp
- Type
- Partnership Firm
- Registered office
- GAUR BIZ PARK, PLOT NO. 1, ABHAY KHAND-ii, INDIRAPURAM, GHAZIBAD, U.P.
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ283531, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
26 documents filed on the UP-RERA portal for UPRERAPRJ283531. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Site coordinates read from the same filings: 28.46255555, 77.55569444 — view on map ↗. A coordinate is not a UP-RERA register field; the register records the district, tehsil and address shown above.
We do not average two readings, split the difference or publish the likelier one. Where our own extraction disagrees with itself the figure is held back and said so, and the filing above is the thing to read. The register itself carries none of these fields, so there is nothing on it to correct.
construction cost, land cost — not published, because our reading of the cost lines adds up to ₹215 Cr inside a project cost we read as ₹204 Cr. A breakdown that does not fit its own total is not a breakdown, so it is held back.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
62% of the registered build period has passed; 24% of the estimated cost is certified spent. The spend figure comes from the CA certificate linked above, the clock from the registered start and completion dates on the register.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- ATEESH AGARWALLicence CA/2003/31212
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Roads
- 40MM High Grade interlocking pavers; Internal roads up to porch with CC/interlocking tiles
- Water supply / tanks
- Centralized water supply from Land-1 Township
- Sewage treatment (STP) capacity
- Connected to Land-1 level sewer line
- Parks
- Landscape at Ground floor level/above Basement; Tree planting as per design
- Electric supply / transformers
- Energy efficient pole mounted LED Light fixture; Energy efficient Plumbing and Electrical fixtures (LED lights, Heat pumps); 15 MW electrical load
- Rainwater harvesting
- Centralized storm water drainage system connected to harvesting pit; Water body used for rainwater harvesting
- Fire safety & staircases
- Centralized fire detection and firefighting system (sprinklers, FHC, hooters, alarm panel, extinguishers)
- Water bodies
- Water body used for rainwater harvesting
- Boundary wall
- Provided as per plan
Other projects nearby
Frequently asked
Is Trecento Residences-A RERA registered?
Yes. Trecento Residences-A is registered with UP-RERA under registration number UPRERAPRJ283531, registered on 09 Oct 2023.
When is Trecento Residences-A due for completion?
The completion date on record for Trecento Residences-A is 17 Jul 2028. Read it yourself against registration UPRERAPRJ283531 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Trecento Residences-A?
Golf Lake Llp, which has 1 project registered with UP-RERA.
Where can I verify Trecento Residences-A's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ283531. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Trecento Residences-A. Straight answers, before you sign anything.