New No extensions UPRERAPRJ422327/10/2024

Signature Park

by R.s. Resource Management Consulting Private Limited · Dadri

Completion on record
06 Jun 2029
Declared at registration · no extensions filed
Speak with an advisor
Signature Park, project image
Builder marketing render via signatureglobal.in, a promotional image, not a UP-RERA record.
Overview Land & costProgressLocationEscrowTeamDevelopment Promoter Documents FAQ
RERA number
UPRERAPRJ422327/10/2024
Gautam Buddha Nagar
Registered
08 Oct 2024
Type: New
Proposed period
61 mo
from 06 Jun 2024
Declared completion
06 Jun 2029
original commitment
Latest on record
06 Jun 2029
unchanged
Documents on portal
20
filed with UP-RERA
01

Registration details

Project name
Signature Park
RERA registration no.
UPRERAPRJ422327/10/2024
Registration type
New
Registration date
08 Oct 2024
Proposed start
06 Jun 2024
District / tehsil
Gautam Buddha NagarDadri
Project address
Plot no -INS- 02 , CHI -V , YAMUNA EXPRESSWAY , GREATER NOIDA , GAUTAM BUDH NAGAR , UTTAR PRADESH , PIN CODE -201310.
Record source
up-rera.in
02

Promoter track record

The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.

Promoter
R.s. Resource Management Consulting Private Limited
Type
Company
Registered office
326, MASTER MIND-1, ROYAL PALM, AAREY COLONY, GOREGAON (EAST) MUMBAI MH 400090 IN
Projects on the register
1
Complaints · promoter-wide
22 (Under Registration - 1 )
Complaints · this project
1filed against Signature Park

A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.

04

Land, build & cost

Transcribed from this project's certificates (CA, architect, engineer and development filings) on the UP-RERA portal. Figures are on the public record; verify at up-rera.in before acting.

View the source certificate (PDF) →
Land area
29.53 ac
119,523 m²
Project size
3.0 bldgs
Project cost
₹342 Cr
construction ₹333 Cr
Cost incurred
₹24 Cr
7.1% of estimated cost
From allottees
₹0 Cr
collected to date
05

Construction progress

How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →

Certified spend7%
of the estimated project cost, certified spent to date
Build clock43%
of the registered build period elapsed

The build clock is running ahead of certified spend: 43% of the registered timeline has passed, but only 7% of the budget is certified spent. A gap worth asking the promoter about.

A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.

06

Location

Coordinates and site details as filed on the project's certificate. View the source certificate (PDF) →

Coordinates
26.740664, 81.072929
07

Bank account

The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →

Collection account
A/c no. 7777702505406
IFSC ICIC0000008
Branch Sector-5, Greater Noida
08

Project team

The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →

Architect
SHYAM PRASADLicence COA/96/19721
09

Development & infrastructure

Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →

Sewage treatment
STP facility provided.
Electric supply / transformers
5 x 2000 KVA Transformers, 3 x 2000 KVA DG Sets, 2 x 600 KVA DG Sets.
Fire safety & staircases
80Ø Hydrant pipes from basement, 150Ø Fire Brigade Drawout Connection, 150MM DIA 4-way Fire Brigade Inlet for U.G. Tank.
Water supply / tanks
Domestic water riser pipes, Flushing water riser pipes, 40Ø Domestic water riser, Underground tank for fire brigade.
Rainwater harvesting
Boring 150mm Ø 18m deep system with overflow to main drain.
Boundary wall
2.400 M HT. Boundary Wall, 1.100 M HT. Solid Wall and 1.000 M HT Railing (front).
Roads
24.000 M wide external road, 6.000 M wide internal roads, 6.000 M wide ramps (slope 1:12 M).
Water bodies
Not specified.
Parks
19555.116 SQM proposed landscape area, 1955 trees.
11

Frequently asked

Is Signature Park RERA registered?

Yes. Signature Park is registered with UP-RERA under registration number UPRERAPRJ422327/10/2024, registered on 08 Oct 2024.

What is the RERA completion date for Signature Park?

The completion date on record is 06 Jun 2029, with no extensions filed against the original commitment.

Who is the developer of Signature Park?

R.S. Resource Management Consulting Private Limited, which has 1 project(s) registered with UP-RERA and 2 complaint(s) on record across its projects.

How many complaints are filed against Signature Park?

1 complaint(s) are recorded against Signature Park specifically on the UP-RERA portal.

Where can I verify Signature Park's RERA details?

On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ422327/10/2024. This page mirrors that public record for convenience.