Signature Park is registered with UP-RERA under registration number UPRERAPRJ422327/10/2024, registered on 08 Oct 2024 by R.s. Resource Management Consulting Private Limited. The completion date on file is 06 Jun 2029. This page mirrors the project's public UP-RERA record, with 20 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Signature Park
- RERA registration no.
- UPRERAPRJ422327/10/2024
- Registration type
- New
- Registration date
- 08 Oct 2024
- Proposed start
- 06 Jun 2024
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Plot no -INS- 02 , CHI -V , YAMUNA EXPRESSWAY , GREATER NOIDA , GAUTAM BUDH NAGAR , UTTAR PRADESH , PIN CODE -201310.
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- R.s. Resource Management Consulting Private Limited
- Type
- Company
- Registered office
- 326, MASTER MIND-1, ROYAL PALM, AAREY COLONY, GOREGAON (EAST) MUMBAI MH 400090 IN
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ422327/10/2024, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
20 documents filed on the UP-RERA portal for UPRERAPRJ422327/10/2024. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
We do not average two readings, split the difference or publish the likelier one. Where our own extraction disagrees with itself the figure is held back and said so, and the filing above is the thing to read. The register itself carries none of these fields, so there is nothing on it to correct.
site coordinates — not published, because the coordinate we read (26.740664, 81.072929) falls outside Gautam Buddha Nagar, which is the district on this project's register entry.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
46% of the registered build period has passed; 7% of the estimated cost is certified spent. The spend figure comes from the CA certificate linked above, the clock from the registered start and completion dates on the register.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- SHYAM PRASADLicence COA/96/19721
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Sewage treatment
- STP facility provided.
- Electric supply / transformers
- 5 x 2000 KVA Transformers, 3 x 2000 KVA DG Sets, 2 x 600 KVA DG Sets.
- Fire safety & staircases
- 80Ø Hydrant pipes from basement, 150Ø Fire Brigade Drawout Connection, 150MM DIA 4-way Fire Brigade Inlet for U.G. Tank.
- Water supply / tanks
- Domestic water riser pipes, Flushing water riser pipes, 40Ø Domestic water riser, Underground tank for fire brigade.
- Rainwater harvesting
- Boring 150mm Ø 18m deep system with overflow to main drain.
- Boundary wall
- 2.400 M HT. Boundary Wall, 1.100 M HT. Solid Wall and 1.000 M HT Railing (front).
- Roads
- 24.000 M wide external road, 6.000 M wide internal roads, 6.000 M wide ramps (slope 1:12 M).
- Water bodies
- Not specified.
- Parks
- 19555.116 SQM proposed landscape area, 1955 trees.
Other projects nearby
Frequently asked
Is Signature Park RERA registered?
Yes. Signature Park is registered with UP-RERA under registration number UPRERAPRJ422327/10/2024, registered on 08 Oct 2024.
When is Signature Park due for completion?
The completion date on record for Signature Park is 06 Jun 2029. Read it yourself against registration UPRERAPRJ422327/10/2024 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Signature Park?
R.S. Resource Management Consulting Private Limited, which has 1 project registered with UP-RERA.
Where can I verify Signature Park's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ422327/10/2024. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Signature Park. Straight answers, before you sign anything.