Lord Krishna Medlley is registered with UP-RERA under registration number UPRERAPRJ639080, registered on 22 Apr 2022 by Saviour Infra Private Limited. The completion date on file is 31 Mar 2026. This page mirrors the project's public UP-RERA record, with 26 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Lord Krishna Medlley
- RERA registration no.
- UPRERAPRJ639080
- Registration type
- New
- Registration date
- 22 Apr 2022
- Proposed start
- 01 Apr 2022
- District / tehsil
- Gautam Buddha Nagar302
- Project address
- Not stated on the register
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Saviour Infra Private Limited
- Type
- Company
- Registered office
- C-110, sector-65 noida-201301
- Projects on the register
- 2
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ639080, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
26 documents filed on the UP-RERA portal for UPRERAPRJ639080. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Site coordinates read from the same filings: 28.65516388, 77.41030555 — view on map ↗. A coordinate is not a UP-RERA register field; the register records the district, tehsil and address shown above.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
100% of the registered build period has passed; 13% of the estimated cost is certified spent. The spend figure comes from the CA certificate linked above, the clock from the registered start and completion dates on the register.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. View the source certificate (PDF) →
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Structural engineer
- Prashant BhatiEngineer & Consultant
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Air conditioning
- DX System for shops, no split/window AC in retail area
- Lifts
- 3 lifts for shopping/food court (Otis/Schindler/Thyssen Krupp/Kone/Johnson)
- Escalators
- 5 escalators for shopping/food court, upper ground to 3rd floor, upward/downward (Otis/Schindler/Thyssen Krupp/Kone/Johnson)
- Electricity (Common Area)
- Corridor Lighting
- Electricity (Shops)
- One DB per shop, separate meter for power backup, main connection from NCPL by buyer
- DG Set
- As per load requirement
- Transformer
- As per load requirement
- Fire Fighting
- As per Fire NOC
- Staircase
- Granite/Marble Flooring (Sadarali/Black/Steel Grey/Equivalent)
- Parking (Basement)
- Trimix Concrete Flooring
- Common Parking
- As per drawings
- Ramp
- Trimix Concrete Flooring
- Soft Landscape
- Natural Grass/Artificial Grass pad/Shrubs/Plants/Trees
- Hard Landscape
- Tiles/Trimix Concrete/Pavers/Kerb Stone/Chequered Tiles
- Landscaping Lighting
- As per design
More from Saviour Infra Private Limited
Other projects nearby
Frequently asked
Is Lord Krishna Medlley RERA registered?
Yes. Lord Krishna Medlley is registered with UP-RERA under registration number UPRERAPRJ639080, registered on 22 Apr 2022.
When is Lord Krishna Medlley due for completion?
The completion date on record for Lord Krishna Medlley is 31 Mar 2026. Read it yourself against registration UPRERAPRJ639080 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Lord Krishna Medlley?
Saviour Infra Private Limited, which has 2 projects registered with UP-RERA.
Where can I verify Lord Krishna Medlley's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ639080. This page mirrors that public record for convenience.