Levante Metro Walk is registered with UP-RERA under registration number UPRERAPRJ211439/02/2026, registered on 18 Feb 2026 by Levante Projects. The completion date on file is 30 Dec 2030. This page mirrors the project's public UP-RERA record, with 35 filed documents you can open on the official UP-RERA portal.
Registration details
- Project name
- Levante Metro Walk
- RERA registration no.
- UPRERAPRJ211439/02/2026
- Registration type
- New
- Registration date
- 18 Feb 2026
- Proposed start
- 10 Jan 2026
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- PLOT NO. C-8, SECTOR-DELTA-1, GREATER NOIDA, DISTRICT-GAUTAM BUDDHA NAGAR, UTTAR PRADESH
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, as filed with UP-RERA.
- Promoter
- Levante Projects
- Type
- Partnership Firm
- Registered office
- 14, THIRD FLOOR, MANAK VIHAR, DELHI-110092
- Projects on the register
- 1
Every figure above is as filed with UP-RERA; open the promoter's own page for each registration, and verify on up-rera.in before you act.
Verify this record in four steps
- Open up-rera.in and choose the registered projects search.
- Search the registration number exactly as printed here, UPRERAPRJ211439/02/2026, rather than the project name.
- On the record, read the promoter, the project address, the registration date and the declared completion date, and compare them with the documents you were shown.
- Open the filed documents, the sanctioned plan and the affidavits, and confirm the unit you are offered belongs to this registered project and phase.
Documents on record
35 documents filed on the UP-RERA portal for UPRERAPRJ211439/02/2026. Each opens on the official portal record.
Land, build & cost
The UP-RERA register does not publish land area, unit, tower or floor counts, or cost lines — none of those are fields on the project's register entry. The figures below are this tracker's own reading of the certificates filed on the portal: taken off scanned PDFs, and not re-checked line by line against the paper. Treat them as our enrichment, not as the record — open the source document before you act on any of them.
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. View the source certificate (PDF) →
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Project team
The consultants named on the project's architect and engineer certificates. View the source certificate (PDF) →
- Architect
- KAVI JAINLicence CA/88/11919
- Structural engineer
- Kavi JainNirman Consultant Pvt Ltd
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. View the source certificate (PDF) →
- Electric supply / transformers
- 1 x 1600 KVA Transformer, 1 x 1600 KVA DG Set, HT Meter provided
- Fire safety & staircases
- Firefighting system with 100 KW load
- Water supply / tanks
- Total water storage 100,000 Liters, 300 mm dia water line
- Rainwater harvesting
- 2 recharge pits (2.0m dia x 3.0m depth), total recharge volume 62.8 m³
- Boundary wall
- Provided around the plot
- Roads
- Adjacent road 106.00 M wide
- Parks
- 962.08 sqm open area (10% of plot area), 20 trees
Other projects nearby
Frequently asked
Is Levante Metro Walk RERA registered?
Yes. Levante Metro Walk is registered with UP-RERA under registration number UPRERAPRJ211439/02/2026, registered on 18 Feb 2026.
When is Levante Metro Walk due for completion?
The completion date on record for Levante Metro Walk is 30 Dec 2030. Read it yourself against registration UPRERAPRJ211439/02/2026 on the UP-RERA portal, which is the authoritative source; this page is an independent mirror.
Who is the developer of Levante Metro Walk?
Levante Projects, which has 1 project registered with UP-RERA.
Where can I verify Levante Metro Walk's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ211439/02/2026. This page mirrors that public record for convenience.
Want to go through this file before you commit?
Speak with an advisor who has actually read this file, the paperwork behind Levante Metro Walk. Straight answers, before you sign anything.