Registration details
- Project name
- Ace Arte
- RERA registration no.
- UPRERAPRJ528653/07/2026
- Registration type
- New
- Registration date
- 28 Jul 2026
- Proposed start
- 15 Aug 2026
- District / tehsil
- Gautam Buddha NagarDadri
- Project address
- Plot No. SC-02/G, Sector-150, Noida, Uttar Pradesh
- Record source
- up-rera.in
Promoter track record
The promoter's wider record on the register, registrations and complaint counts, as filed with UP-RERA.
- Promoter
- Ace Infracity Developers Private Limited
- Type
- Company
- Registered office
- 01-B, Sector-126, Noida, U.P.
- Projects on the register
- 4
- Complaints · promoter-wide
- 1414 (Under Registration - 2 )
- Complaints · this project
- 0filed against Ace Arte
A complaint is an allegation filed with UP-RERA, not a finding of wrongdoing, matters may be pending, withdrawn, dismissed, or decided in the promoter's favour. We show the count, as on 07 Jul 2026, so you can ask about it. A completion-date extension is a lawful entry on the register, not an admission of fault.
Documents on record
32 documents filed on the UP-RERA portal for UPRERAPRJ528653/07/2026. Each opens on the official portal record.
Land, build & cost
All values below are transcribed from ACE Arte's filings on the UP-RERA public portal (registration, CA/architect certificates, sanctioned layout and development affidavit). Figures are facts on the public record; verify at up-rera.in before acting.
| Block | Units |
|---|---|
| TOWER-A1 | 21 |
| TOWER-A2 | 21 |
| TOWER-A3 | 21 |
| TOWER-A4 | 21 |
| TOWER-B1 | 22 |
| TOWER-B2 | 22 |
| TOWER-C1 | 23 |
| TOWER-C2 | 24 |
| TOWER-C3 | 24 |
| TOWER-C4 | 24 |
| TOWER-C5 | 24 |
| COMMERCIAL | 8 |
| Total (12 blocks) | 795 |
Construction progress
How far the money and the build clock have moved, from the certified figures on the project's filings. Verify this on the UP-RERA portal →
Certified spend is broadly keeping pace with the build timeline.
A snapshot from certified filings, not a live feed; the build clock is computed from the registered start and current completion date. Verify at up-rera.in.
Location
Coordinates and site details as filed on the project's certificate. Verify this on the UP-RERA portal →
- Address
- Plot No. SC-02/G, Sector-150, Noida, Uttar Pradesh
- Sector
- Sector-150
- Sanctioning authority
- Noida Authority
- Coordinates
- 28.4314, 77.4836
Bank account
The collection account into which buyers deposit, as named on the project's certificate filed with UP-RERA. Verify this on the UP-RERA portal →
Project team
The consultants named on the project's architect and engineer certificates. Verify this on the UP-RERA portal →
- Contractor
- AAM Realtech Private Limited96C, MIG Flat, Century Apartment, Sector-100, Noida, U.P.
- Architect
- Vishal SharmaLicence CA/1998/23261
- Structural engineer
- V.D. SharmaOptimum Design Private Limited, B-24, Sector-67, Noida
- Khasra / plot
- SC-02/G, Sector-15060,000.54 m² · 1 plot
Development & infrastructure
Committed works as stated in the project's development affidavit on the portal. Verify this on the UP-RERA portal →
- Sewage treatment (STP)
- 540 KLD centralized, in 2 modules of 270 KLD each
- Electric supply
- 3 transformers — 2 × 2000 KVA and 1 × 1600 KVA; street lighting per approved plan
- Fire safety
- Sprinklers, smoke detectors, fire alarms; 2 fire tanks of 285 KLD each; fire water 400 KL + 170 KL water curtain
- Fire staircases
- 1500 mm and 2000 mm wide
- Water supply
- Noida Authority supply; 2 raw + 2 treated water tanks of 100 KLD each
- Rainwater harvesting
- 15 RWH pits; dual-flush and water-saving fittings
- Stormwater drains
- 2 outlets — 187.50 L/sec and 191.67 L/sec
- Boundary wall
- approx. 945.27 m running length, RCC/brick with plaster and railing
- Roads
- 7.5 m wide access road to all towers and commercial
- Water bodies
- 5–6 nos. per approved building plan
Permits
Permit numbers and validity as recorded on the project's filings. Verify this on the UP-RERA portal →
- Original permit no.
- Noida/Planning/2026/1328
- Permit date
- 09-06-2026
- Valid upto
- 09-06-2031
- Extendable upto
- 09-06-2033
Other projects nearby
Frequently asked
Is Ace Arte RERA registered?
Yes. Ace Arte is registered with UP-RERA under registration number UPRERAPRJ528653/07/2026, registered on 28 Jul 2026.
What is the RERA completion date for Ace Arte?
The completion date on record is 15 Feb 2031, with no extensions filed against the original commitment.
Who is the developer of Ace Arte?
Ace Infracity Developers Private Limited, which has 4 project(s) registered with UP-RERA and 14 complaint(s) on record across its projects.
How many complaints are filed against Ace Arte?
0 complaint(s) are recorded against Ace Arte specifically on the UP-RERA portal.
Where can I verify Ace Arte's RERA details?
On the official UP-RERA portal at up-rera.in, under registration number UPRERAPRJ528653/07/2026. This page mirrors that public record for convenience.