945 projects declared a build period: median 60 months

Of the 974 projects on this mirror, 945 declare how many months the work was expected to take. The shortest is 3, the longest 245, and 124 declare 60.

The build period is declared at registration

The median is 60 months, and so is the most common answer

The four bands the declared periods fall into

The shortest is 3 months. The longest is 245.

The timing fields a project record carries

What the declared period does not tell you